GLOSSARY

The terms behind the numbers

TDC, DSCR, NPV, IRR, and the other recurring terms across WaVES guides, defined once, plainly, in one place.

Total Development Cost

(TDC)

Everything it costs to get a project from land to a sellable or rentable finished unit, land acquisition, construction, professional fees, permits and statutory charges, financing costs, and contingency. It's the denominator most profitability and margin figures are measured against.

Debt Service Coverage Ratio

(DSCR)

A project's net operating income divided by its debt obligations for the same period. A DSCR above 1.0 means the project generates more income than it needs to cover its debt payments; lenders typically want comfortable headroom above that, not just a bare pass.

Net Present Value

(NPV)

The value today of a project's future cash flows, after discounting them back by a chosen rate to account for the fact that money now is worth more than the same amount later. A positive NPV means the project is expected to create value above that discount rate; a negative one means it isn't.

Internal Rate of Return

(IRR)

The discount rate at which a project's NPV works out to exactly zero, in effect, the annualized return the project is expected to generate on its own. Used to compare projects of different sizes and durations against each other and against a hurdle rate.

Hurdle Rate

The minimum return a project has to clear before it's worth pursuing over doing nothing (or over an alternative use of the same capital). If a project's IRR falls below the hurdle rate, the numbers are telling you the risk isn't being paid for.

Nigerian Construction Index Dashboard

(NCID)

WaVES's live feed of Nigerian construction cost, inflation, and financing indicators, covering Lagos, Abuja, Port Harcourt, Ibadan, Kano, and Kaduna directly, with a state-level average standing in everywhere else. It's the market-data layer the other modules pull current numbers from, rather than relying on stale published rates.

Joint Venture

(JV)

A structure where a landowner contributes land and a developer contributes construction capital and expertise, with proceeds (units, rent, or sale revenue) split between them by an agreed ratio instead of the landowner selling outright or the developer paying full price for the land upfront.

Certificate of Occupancy

(C of O)

The document issued by a state government confirming a right of occupancy over land, and the single most-checked item in Nigerian title verification. Its absence, or a mismatch with the person claiming to sell, is one of the most common red flags in a deal.

Contingency

A budget line set aside for cost overruns and unforeseen scope changes that weren't in the original estimate, typically a percentage of total construction cost, sized up or down based on how well-defined the scope and site conditions already are.

Margin

Profit expressed as a percentage of revenue (sale price or total rent collected), rather than as a percentage of cost. Useful for comparing how much of every naira coming in is actually profit, as distinct from return on the capital that was put in.

Return on Investment

(ROI)

Profit expressed as a percentage of the capital actually invested, rather than of revenue. A project can have a healthy margin but a weak ROI if it required a disproportionate amount of capital to get there, which is why the two numbers are checked separately, not interchangeably.

Rental Yield

Annual rental income expressed as a percentage of a property's value or total development cost, the core number behind a sell-vs-hold-to-rent decision, since it's what determines whether holding a completed unit beats taking the sale proceeds now.